Honeywell
📢 100% genuine, extensive in-stock inventory, fast shipping!
Honeywell 51202789-901 Violet I/O Link Cable
Honeywell 51202789-901 Violet I/O Link Cable
Manufacturer: Honeywell
-
Product No.: 51202789-901
Condition:in Stock
Product Type: Violet I/O Link Cable
-
Product Origin: USA
Payment:T/T, Western Union
-
Weight: 1000g
Shipping port: Shanghai/Yiwu/Shenzhen
Warranty: 12 months
Share
Honeywell 51202789-901 Violet I/O Link Cable
The Honeywell 51202789-901, also cataloged as the 51202789 I/O Link Cable, operates as a shielded extender assembly for high-speed digital communication between Honeywell controllers, Series C I/O modules, and MOXA gateways in distributed control system (DCS) environments.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | 51202789-901 (Rev. B) |
| Brand | Honeywell |
| Origin | USA |
| Weight | Not specified |
| Dimensions | Length 20 in (0.5 m) |
| Operating Temp | -40 to +85 deg C |
| Storage Temp | Not specified |
| Relative Humidity | Up to 95%, non-condensing |
| Power Consumption | Passive cable |
| Core Performance | Violet shielded cable with RJ45/Honeywell-specific headers |
4-20 mA HART Loop Protocol and Channel Isolation
The cable is engineered for Honeywell Experion PKS and C300 controllers, supporting integration with Series C I/O modules and legacy TDC 3000 systems. Heavy EMI/RFI shielding ensures stable communication in high-noise environments. Channel-to-channel isolation is preserved through conductor geometry, maintaining signal integrity across cabinet layouts and supporting HART loop protocol stability.
Frequently Asked Questions
Q: Can the 51202789-901 be used interchangeably with the 51202789-900? A: No, the 901 variant is shorter (20 in) and optimized for localized cabinet routing, while the 900 variant is longer (1 m).
Q: How should shielding be terminated during installation? A: Shielding must be grounded at the controller termination point only to prevent ground loop currents.
Q: Is the cable suitable for redundant communication paths? A: Redundancy is managed at the controller level; the cable provides standard single-path extension.
Field Installation Guidelines
- Install into cabinet routing with full connector engagement on RJ45 and Honeywell-specific headers.
- Route separately from high-voltage conductors to minimize EMI/RFI interference.
- Ground shielding at the controller termination point only.
- Verify continuity and insulation integrity before commissioning.
- Avoid mechanical stress or bending beyond manufacturer specifications.
Hot Tags :

- Choosing a selection results in a full page refresh.
- Opens in a new window.